What does installation involve that replacement does not?
An installation starts from an open rough opening rather than an existing window. That means setting the unit plumb, level and square, shimming at the correct points so the frame does not crown, fastening through the frame or the flange according to the product, and integrating the water-resistive barrier and flashing in the right order. On a replacement much of that sequence is inherited from the old installation. On a new opening it is all built from the studs out, which is why installation is a different trade conversation than swapping a unit into a hole that already exists.
Why is flashing the part that decides whether it leaks?
Water gets behind every window in a hard rain; the question is where it goes next. Correct flashing runs the weather-resistive barrier in shingle fashion so that each layer overlaps the one below and water always drains outward over the layer beneath rather than behind it. Head flashing above, sill pan and end dams below, and the side layers lapping in sequence. Skip the sill pan or run the housewrap over the flange instead of under it, and the opening becomes a funnel into the wall cavity. The failure does not appear for a season or two, which is exactly why cheap installations look fine on handover and terrible two winters later.
How does stucco change the installation sequence?
Stucco is a drainage-plane wall, and the window flange has to sit correctly relative to the paper, the wire lath and the three-coat finish. The unit goes in before the lath, the flange is integrated with the weather barrier, and the stucco is then brought to the frame with the proper casing bead and sealant joint. In an addition where the existing wall is already finished, the perimeter has to be cut back neatly to reach the framing cleanly, then rebuilt. Getting that sequence wrong shows up as a crack line at the window perimeter and a damp patch inside the wall rather than at the glass.
What should be checked before the walls close?
Before the lath goes on, confirm the unit is plumb and level, that the shims are at the correct bearing points and not just jammed in the corners, that the flange is fastened at the specified spacing, and that the sill is set with a positive slope to the exterior. Check that the opening size and the egress dimension are what the plan says, because a bedroom window that does not meet egress after the stucco is a very expensive correction. Photograph the flashing sequence; it is the single most useful record if a leak question ever arises.
Get a written figure for this job
Installation quotes follow the rough opening, the flashing sequence and the wall assembly, not just the product. Bring the plan or the opening dimensions if you have them, and the visit confirms what the framing will actually take before anything is fabricated.
How is a rough opening checked before the window arrives?
The opening is measured in three places for width and three for height, because framing is rarely perfectly parallel, and the smallest reading governs. Diagonal measurements confirm the opening is square; a difference of more than an eighth of an inch across the diagonals means the framing needs correction before a window is ordered. The sill is checked for level and for the correct slope to drain outward, and the header is checked for deflection. If the opening was framed by someone else, those checks are worth doing before the unit is fabricated, because correcting a rough opening costs a fraction of correcting a finished window that does not fit.
What is different about egress windows?
A bedroom window that serves as a means of escape has a minimum clear opening, a maximum sill height and a specified operating type, and those dimensions are not negotiable for the sake of appearance. A slider with a fixed panel on the wrong side, or a unit whose clear opening falls short after the frame is installed, fails the requirement even though the window itself is fine. That is why egress is settled at the design stage and confirmed against the opening before ordering. A window replaced later with a different operating type can quietly remove egress from a room, which is a problem when the house is sold or inspected.
How does a window tie into the wall assembly?
A window is not a hole with glass in it, it is a component of the wall assembly, and it has to be integrated with the layers that manage water and air. On a stucco wall the sequence runs: framing, sheathing, weather-resistive barrier, then the window with its flange lapping correctly over or under the barrier depending on the product, then flashing at the head and a sill pan at the base, then lath and the three-coat stucco finished with a casing bead and a sealant joint at the frame. Each layer has a job and a direction. The barrier sheds bulk water, the flashing directs it out at the opening, the sealant handles movement at the frame, and the stucco protects all of it. Miss one layer or run it in the wrong direction and the wall becomes a reservoir rather than a shield, which is why a properly installed window is judged by what is behind the stucco.
Common questions
Is installation different from replacement?
Yes, structurally. Replacement sets a unit into an existing frame or opening. Installation builds the opening from the rough framing out, including the full flashing and water-resistive barrier sequence, so the scope and the risk sit in different places.
Can windows be installed in an addition before the stucco?
They should be. The unit goes in before lath and stucco so that the flange integrates with the weather barrier and the stucco is brought to the frame with a proper casing bead. Installing after the stucco means cutting back a finished wall.
Do I need a permit for new window openings?
New or resized openings are a structural and egress question, so they normally go through a permit review with the authority that has jurisdiction over the address, plus any HOA or design approval on top. The permit is a separate item with its own fee.
What is checked at the end of the installation?
Operation of every sash and lock, the sealant joint at the perimeter, the sill slope and drainage path, and confirmation that the flashing sequence was photographed before it was covered. Any defect found at that point is corrected before the wall is closed.